|
BCSEA.org (984 words) |
 | The BC Building Code should be amended to include specific encouragement for ground source systems, requiring their installation wherever geological and space considerations make them feasible. |
 | BC Hydro should advance low interest loans for ground source heat systems, since the reduced demand will free up kilowatts that can be sold elsewhere, while offsetting the need for new power generation. |
 | The BC government should waive the PST on ground source heat systems, and create a 100% tax-credit for their installation, to encourage their use. |
| Overview - BCM - Summer 2004 (663 words) |
 | BC paid $10,000 for the 52.7 acres, with the cost of filling in the basin estimated at $750,000. |
 | Alumni Stadium was in place by 1957, and over the next 45 years, BC built a village to house undergraduate students, with the latest addition—the St. Ignatius Gate Residence Hall—scheduled to open in August 2004. |
 | BC assumed Newton College's liabilities of approximately $5 million, hired Newton College faculty, and undertook responsibility for supporting alumnae activities. |