This is the last step in Proton integration, after which the entire complex is loaded by cranes on the flat railroad transporter and it is ready for rollout to the launch pad.
The railroad transporter with the rocket in horizontal position moves with its front chassis on top of the stationary erector of the launch pad.
The rear chassis of the transporter remains on the railway.