FACTOID # 87: 22% of American women aged 20 gave birth while in their teens. In Switzerland and Japan, only 2% did so.
 
 Home   Encyclopedia   Statistics   Countries A-Z   Flags   Maps   Education   Forum   FAQ   About 
 
WHAT'S NEW
RECENT ARTICLES
More Recent Articles »
 

SEARCH ALL

FACTS & STATISTICS    Advanced view

Search encyclopedia, statistics and forums:

 

 

(* = Graphable)

 

 


Encyclopedia > Construction management

Construction Management refers either to the study and practice of the managerial and technological aspects of the construction industry (including construction, construction science, construction management, and construction technology), or to a business model where one party to a construction contract serves as a construction consultant, providing both design and construction advice. Construction on the North Bytown Bridge in Ottawa, Canada. ...


The Construction Management Association of America (CMAA) says the 120 most common responsibilities of a Construction Manager fall into the following 7 categories: 1. Project Management Planning, 2. Cost Management, 3. Time Management, 4. Quality Management, 5. Contract Administration, 6. Safety Management and 7. CM Professional Practice which includes specific activities like defining the responsibilities and management structure of the project management team, organizing and leading by implementing project controls, defining roles and responsibilities and developing communication protocols, and identifying elements of project design and construction likely to give rise to disputes and claims.

Contents

Study and practice

Construction management education comes in a variety of formats: formal degree programs (two-year associate degree; four-year baccalaureate degree, graduate degree, etc); on-job-training; and continuing education / professional development. For information on degree programs, reference ACCE, the American Council for Construction Education, or ASC, the Associated Schools of Construction.
The recognized institute for construction management in Great Britain is The Chartered Institute of Building in Ascot.


According to the American Council for Construction Education (the academic accrediting body of construction management educational programs in the U.S.), the academic field of construction management encompasses a wide range of topics. These range from general management skills, to management skills specifically related to construction, to technical knowledge of construction methods and practices. There are many schools offering Construction Management programs, including some that offer a Masters degree. A comprehensive list can be found at http://www.usnews.com/usnews/edu/college/tools/search.php#
[1]


Business model

Typically, the construction industry includes three parties: an owner, a designer (called the architect/engineer), and the builder (called the contractor). Traditionally, there are two contracts between these three parties as they work together to plan, design, and construct the project. The first contract is the owner-designer contract, which involves planning, design, and possibly, some aspects of construction. The second contract is the owner-contractor contract, which involves construction. An indirect, third-party relationship exist between the designer and the contractor due to these two contracts.


An alternate contract or business model replaces the two traditional contracts with three contracts: owner-designer, owner-construction manager, and owner-builder. The construction management company becomes an additional party engaged in the project to act as an advisor to all three parties. The construction manager's role is to provide construction advice to the designer, design advice to the constructor, and both construction and design services, such as materials and subcontracts as necessary, to the owner.


Agency CM

"Agency" CM is a fee-based service in which the construction manager is responsible exclusively to the owner and acts in the owner's interests at every stage of the project. The construction manager offers advice, uncolored by any conflicting interest, on matters such as:

  • Optimum use of available funds;
  • Control of the scope of the work;
  • Project scheduling;
  • Optimum use of design and construction firms' skills and talents;
  • Avoidance of delays, changes and disputes;
  • Enhancing project design and construction quality;
  • Optimum flexibility in contracting and procurement.

Comprehensive management of every stage of the project, beginning with the original concept and project definition, yields the greatest possible benefit to owners from Construction Management.


CM At Risk G B Lewis 12:29, 13 January 2007 (UTC)===At-Risk CM=== "At-Risk" CM is a delivery method which entails a commitment by the construction manager to deliver the project within a Guaranteed Maximum Price (GMP), in most cases. The construction manager acts as consultant to the owner in the development and design phases, (often referred to as "Preconstruction Servies"), but as the equivalent of a general contractor during the construction phase. When a construction manager is bound to a GMP, the most fundamental character of the relationship is changed. In addition to acting in the owner's interest, the construction manager must manage and control construction costs to not exceed the GMP, which is a financial hit the CM company.


CM "At Risk" is a global term referring to a business relationship of Construction contractor, Owner and Architect / Designer. Typically, a CM At Risk arrangement eliminates a "Low Bid" construction project. A GMP agreement is a typical part of the CM and Owner agreement somewhat comparable to a "Low Bid" contract, but with a number of adjustments in responsibilities required by the CM. Aspects of GMP agreements will be elaborated below. The following are some primary aspects of the most potential benefits of a CM At Risk arrangement:


Budget management: Before design of a project is completed ( 6 months to 1-1/2 years of coordination between Designer and Owner), the CM is involved with estimating cost of constructing a project based on hearing from the designer and Owner (design concept) what is going / desired to be built. Upon some aspect of desired design raising the cost estimate over the budget the Owner wants to maintain, a decision can be made to modify the design concept instead of having to spend a considerable amount of time, effort and money re-designing and/or modifying completed construction documents, OR, the Owner decides to spend more money or obtain higher financial support for the project. To manage the budget before design is done, construction crews are mobilized, CM is spending tens of thousands per week just having onsite management, major items are purchased, etc, etc,...is an extremely more effcient use of everyone's time, effort, Architect / Designer's costs, and the CM's General Conditions costs, AND delivering to the Owner a design within his budget.


Selecting constructor: ( to be elaborated )


Maintaining positive working relationships among the Owner, Architect / Designer and Constructor: ( to be elaborated )


Maximizes the awareness among Owner, Architect / Designer and CM of all parties needs, expectations in order to perform their part of the project in the most efficient manner. ( to be elaborated )


"Fast Track" construction / design: ( to be elaborated )


Regulation

In the UK the industry is regulated though Construction Design Management regulations, which prevent incidents on construction sites and civil engineering structures once completed


External links

Reference

For the Manfred Mann album, see 2006 (album). ... May 29 is the 149th day of the year in the Gregorian calendar (150th in leap years). ...

See also


  Results from FactBites:
 
Construction managers (2235 words)
Construction managers plan, direct, and coordinate a wide variety of construction projects, including the building of all types of residential, commercial, and industrial structures, roads, bridges, wastewater treatment plants, and schools and hospitals.
Construction managers may oversee an entire project or just part of a project and, although they usually play no direct role in the actual construction of a structure, they typically schedule and coordinate all design and construction processes, including the selection, hiring, and oversight of specialty trade contractors.
Construction managers may be owners or salaried employees of a construction management or contracting firm, or may work under contract or as a salaried employee of the property owner, developer, or contracting firm overseeing the construction project.
Construction Management (1930 words)
Throughout the construction phase of a given project the two construction managers work together to complete the project to the satisfaction of the owner and the contract documents; One CM is the project owners agent while the other works for the general contractor.
Construction management is a process by which a potential project owner engages an agent, referred to as a construction manager.
The construction manager has the obligation to serve the owner as if he or she was an employee of the owner.
  More results at FactBites »


 

COMMENTARY     


Share your thoughts, questions and commentary here
Your name
Your comments
Please enter the 5-letter protection code

Want to know more?
Search encyclopedia, statistics and forums:

 


Lesson Plans | Student Area | Student FAQ | Reviews | Press Releases |  Feeds | Contact
The Wikipedia article included on this page is licensed under the GFDL.
Images may be subject to relevant owners' copyright.
All other elements are (c) copyright NationMaster.com 2003-5. All Rights Reserved.
Usage implies agreement with terms.