|
The Standard - Disneyland Resort rail link to open August 1 - Metro Section (428 words) |
 | Disneyland Resort Line, the rail link running between the new Tung Chung Line Sunny Bay Station and the Disneyland Resort Station, will be open to the public August 1. |
 | Lau said there will be contingency measures in place to control the crowd at Disneyland Resort Station, while a small section of the Park Promenade between the station exit and the park entrance will be open for public access to facilitate smooth pedestrian flow. |
 | The fare from Sunny Bay to Disneyland Resort Station is HK$6. |
| Disneyland Resort Line | Tunnels | Arup (206 words) |
 | The Disneyland Resort Line (DRL) provides a shuttle service between the Sunny Bay station interchange on the Tung Chung Line (TCL) and the Disneyland Resort station. |
 | The main tunnel was constructed by drill and blast and the exposed rock surface was finished with a smoothing layer of shotcrete before installation of a geotextile fleece and a waterproof membrane. |
 | This was applied in a composite ‘sandwich’ structure with the smoothing shotcrete, drainage fleece mat, sprayed membrane, and permanent lining. |