NJDEP Land Use Regulation Program (DLUR) - Stream Encroachment Program (1309 words) |
 | In all these cases you are most likely in a flood plain and you probably need a Stream Encroachment Permit before you build. |
 | There are two types of stream encroachment permits - minor and major. |
 | If you do have to obtain a stream encroachment permit you may want to hire a professional engineer or environmental consultant to help you prepare and submit your application. |
| Encroachment (111 words) |
 | Permanent structures or improvements cannot be located in any drainage and utility easement without a consent of encroachment. |
 | To begin the application process for a consent of encroachment, it is advisable to first call Vicky Reha 327-5245 to see if building in the respective easement is at all possible. |
 | If so, you will need to come into our offices at 604 N Sherman Dr with a site plan that shows the easement and the location of the proposed fence or structure, and speak with an infrastructure project manager. |