1. A fixed, mobile, or transportable structure, including (a) all installed electrical and electronic wiring, cabling, and equipment and (b) all supporting structures, such as utility, groundnetwork, and electrical supporting structures.
2. A network-provided service to users or the network operating administration.
3. A transmission pathway and associated equipment.
4. In a protocol applicable to a data unit, such as a block or frame, an additional item of information or a constraint encoded within the protocol to provide the required control.
5. A real property entity consisting of one or more of the following: a building, a structure, a utility system, pavement, and underlying land.
Facility identification data can serve as a tool to empower communities by aiding them in identifying the presence of detailed environmental data related to a specific facility within their localities.
Facilities would be provided an opportunity to voluntarily review and verify (electronically) their reconciled facility record if they choose to do so.
It is envisioned that facilities that are subject to one or more Federal environmental reporting requirements that are identified in the rule would be subject to the facility data reporting requirements of a potential rule.