|
The Fairlie Branch (also known as the Eversley Branch) was a branch line railway in southern Canterbury that formed part of New Zealand's national railway network. Construction began in 1884, and at its fullest extent, it terminated just beyond Fairlie in Eversley. Its closure came in 1968, but a portion remains open in Pleasant Point as the Pleasant Point Museum and Railway. A branch line is a relatively minor railway line which branches off a more important through route. ...
The New Zealand region of Canterbury mostly comprises the Canterbury Plains. ...
// National Rail Network The national rail network (currently owned by a State-Owned Enterprise, the New Zealand Railways Corporation) was constructed largely by government entities from 1863 onwards. ...
1884 (MDCCCLXXXIV) is a leap year starting on Tuesday (click on link to calendar) of the Gregorian calendar (or a leap year starting on Thursday of the 12-day-slower Julian calendar). ...
Fairlie is a town in the Canterbury region of the South Island of New Zealand. ...
1968 (MCMLXVIII) was a leap year starting on Monday (the link is to a full 1968 calendar). ...
Pleasant Point is a small country town in southern Canterbury, New Zealand, some 19km inland from Timaru. ...
The Pleasant Point Museum and Railway is a heritage railway located in the small country town of Pleasant Point in southern Canterbury, New Zealand, inland from Timaru. ...
[edit] Construction
Proposed in the early 1870s, a branch line from Timaru to Pleasant Point was approved in December 1872 by the local government and a construction contract let in the following March. After a railway act approving the line was passed later in 1873, construction could commence, and it did so on 18 February 1874. The branch left the Main South Line at Washdyke, now a northern suburb of Timaru, and headed northwest towards Pleasant Point. Construction of this 14.4 kilometres of railway proceeded without any notable difficulties, opening for service on 24 December 1875 - though trains had been able to run to Pleasant Point as early as two months previously. // Events and Trends Technology The invention of the telephone (1876) by Alexander Graham Bell. ...
Timaru is a major port city in south Canterbury, New Zealand, located 160 kilometres south of Christchurch and about 200 kilometres north of Dunedin on the eastern Pacific coast of the South Island. ...
February 18 is the 49th day of the year in the Gregorian Calendar. ...
1874 (MDCCCLXXIV) was a common year starting on Thursday (see link for calendar). ...
The Main South Line is half of the South Island Main Trunk Railway in New Zealand and runs south from Lyttelton through Christchurch and down the east coast of the South Island to Invercargill via Dunedin. ...
December 24 is the 358th day of the year in the Gregorian Calendar (359th in leap years). ...
1875 (MDCCCLXXV) was a common year starting on Friday (see link for calendar). ...
An extension followed swiftly, with the 27 kilometre long addition to Albury opened on 21 January 1877. Another twelve kilometres followed in a few years when the line was opened to Winscombe on 24 August 1883, and after less than half a year, the final portion of the line was opened, to the locale of Eversley, just beyond Fairlie. This gave the line a full length of 58.3 kilometres. January 21 is the 21st day of the year in the Gregorian calendar. ...
1877 (MDCCCLXXVII) was a common year starting on Monday (see link for calendar). ...
August 24 is the 236th day of the year in the Gregorian Calendar (237th in leap years), with 129 days remaining. ...
1883 (MDCCCLXXXIII) was a common year starting on Monday (see link for calendar). ...
There were proposals to extend the branch even further, and 27 kilometres of formation was made to varying standards of completion, but ultimately no rails were laid and the line's furthest terminus remained Eversley. [edit] Stations The following stations were located on the Fairlie Branch (in brackets is the distance from Washdyke): - Levels (6 km)
- Waitawa (10 km)
- Pleasant Point (14 km)
- Sutherlands (22 km)
- Cave (30 km)
- Ma Waro (35 km)
- Albury (41 km)
- Tengawai (42 km)
- Cricklewood (48 km)
- Winscombe (53 km)
- Fairlie (57 km)
- Eversley (58 km)
[edit] Operation The line's reason for existence was to open up farmland in the region behind Timaru and promote rural development. When opened to Pleasant Point, two trains ran each way a day, but when Fairlie was reached, the line's timetable was adjusted to the pattern typical of many rural New Zealand branch lines, with a single "mixed" train carrying both passengers and freight running each way per day. Special freight trains ran as necessary, especially to collect livestock from Pleasant Point. For a period, the line also had its own dedicated passenger train, nicknamed the "Fairlie Flyer", but it perhaps did not live up to its fast-sounding name; by the late 1920s, it was quicker to travel by car between Fairlie and Timaru, which resulted in a decline of traffic that led to the train's cancellation in 1930. From this time, passengers were solely catered for by the daily mixed train. ...
The line had also started making a loss around this period, and on 1 April 1934, the short section from Fairlie to Eversley was closed. It had always been operated as an extension of the Fairlie yard and its existence had become redundant. The rest of the line entered into a slow demise, with passenger services cut to thrice weekly in 1953; the mixed train operated Mondays, Wednesdays, and Fridays, with solely freight carried on Tuesdays and Thursdays. Intense competition from road posed problems for the line, and what traffic it did retain was mainly due to government subsidies. Despite this, by 1966, the livestock traffic that had been the line's primary cargo was all but non-existent and the decision was soon made to close the line. The date of closure was 2 March 1968 and the occasion was marked by a special return of the Fairlie Flyer, attracting large crowds of locals. April 1 is the 91st day of the year (92nd in leap years) in the Gregorian calendar, with 274 days remaining. ...
1934 (MCMXXXIV) was a common year starting on Monday (link will take you to calendar). ...
March 2 is the 61st day of the year in the Gregorian Calendar (62nd in leap years). ...
1968 (MCMLXVIII) was a leap year starting on Monday (the link is to a full 1968 calendar). ...
[edit] The branch today Remnants of closed railway lines diminish and disappear as a result of natural and human activity, but some relics from the Fairlie Branch's operating days still exist, most notably the 2.5 kilometres of restored trackage still in use by the Pleasant Point Museum and Railway. For much of the line's length from Timaru to Fairlie, the formation can be seen making its way through the rolling countryside, and abutments and piles still stand at the site of some bridges. Loading banks still exist at the site of Levels, Waitawa, Sutherlands, and Cave stations. Levels also still possesses its goods shed and Waitawa has the remnants of a platform, and water vat foundations remain in Levels and Tengawai. Beyond Eversley, the formation that was constructed but never used can even still be seen. The Pleasant Point Museum and Railway is a heritage railway located in the small country town of Pleasant Point in southern Canterbury, New Zealand, inland from Timaru. ...
A goods shed is a railway building designed for storing goods before or after carriage in a train. ...
[edit] Resources - Churchman, Geoffrey B., and Hurst, Tony; The Railways Of New Zealand: A Journey Through History, HarperCollins Publishers (New Zealand), 1991 reprint
- Leitch, David, and Scott, Brian; Exploring New Zealand's Ghost Railways, Grantham House, 1998 revised edition
| New Zealand Railway Lines | Main lines North Island: East Coast Main Trunk - North Island Main Trunk The New Zealand railway network consists of four main lines, six secondary lines and numerous short branch lines in almost every region of New Zealand. ...
The North Island Main Trunk Railway (NIMT) is the railway line connecting Auckland and Wellington, the two major cities of New Zealands North Island. ...
South Island: Main North Line and Main South Line, known together as the South Island Main Trunk The Main North Line, sometimes referred to as part of the South Island Main Trunk Railway, is an important railway line in New Zealand that runs north from Christchurch up the east coast of the South Island to Picton. ...
The Main South Line is half of the South Island Main Trunk Railway in New Zealand and runs south from Lyttelton through Christchurch and down the east coast of the South Island to Invercargill via Dunedin. ...
The South Island Main Trunk Railway runs down the east coast of the South Island of New Zealand, from Picton to Bluff. ...
Secondary lines North Island: Marton - New Plymouth Line - North Auckland Line - Palmerston North - Gisborne Line - Stratford - Okahukura Line - Wairarapa Line The North Auckland Line is a major railway line in New Zealands national rail network. ...
South Island: Midland Line - Nelson Section - Otago Central Railway - Stillwater - Westport Line - Waimea Plains Railway The Midland line is a famous 212 km section of railway between Christchurch (Rolleston) and Greymouth in New Zealand. ...
The Otago Central Railway or Otago Central Branch Railway was a secondary railway line in Central Otago, in the South Island of New Zealand. ...
The Waimea Plains Railway was a secondary railway line (not a branch line) that linked the towns of Lumsden and Gore in northern Southland, New Zealand. ...
Branch lines Upper North Island Cambridge - Dargaville - Donnelly's Crossing - Glen Afton - Kinleith - Kumeu-Riverhead - Mount Maunganui - Murupara - Newmarket - Okaihau - Onehunga - Onerahi - Opua - Rotorua - Taneatua - Thames - Waiuku and Mission Bush The Dargaville Branch is a branch line railway that leaves the North Auckland Line not far south of Whangarei and runs westward to Dargaville. ...
The Donnellys Crossing Section (later the Donnellys Crossing Branch), also known as the Kaihu Valley Railway, was a railway line in Northland, New Zealand. ...
The Kumeu-Riverhead section was a short-lived railway line located north-west of Auckland, New Zealand. ...
The Auckland-Newmarket Line (sometimes called the Newmarket Branch) is the railway line between Britomart and Newmarket. ...
The Okaihau Branch, sometimes known as the Kaikohe Branch and rarely as the Rangiahua Branch, was a branch line railway that joined with the national rail network of New Zealand at the northern terminus of the North Auckland Line in Otiria. ...
The Onerahi Branch, sometimes known as the Grahamstown Railway, was a branch line railway in the Northland Region of New Zealand. ...
The Bay of Islands Vintage Railway (sometimes erroneously called the Opua Branch, once the Otiria-Opua Industrial Line) is a former section of the North Auckland Line in the Northland Region of New Zealand between Kawakawa and the Bay of Islands township of Opua. ...
Lower North Island Ahuriri - Castlecliff and Wanganui - Foxton - Greytown - Johnsonville - Melling - Mount Egmont - Moutohora - Ngatapa - Opunake - Raetihi - Taonui - Te Aro - Waitara The Foxton Branch was a railway line in New Zealand. ...
The Taonui Branch was a minor railway line in New Zealands national network. ...
Upper South Island Blackball and Roa - Cape Foulwind - Conns Creek - Eyreton - Fairlie - Little River - Lyttelton - Methven - Mount Somers - Oxford - Rapahoe - Rewanui - Hokitika/Ross - Seddonville - Southbridge - Waiau - Waimate - Whitecliffs The Blackball Branch was a branch line railway that formed part of New Zealands national rail network. ...
The Eyreton Branch was a branch line railway that formed part of New Zealands national rail network. ...
The Methven Branch was a branch line railway that was part of New Zealands national rail network in Canterbury. ...
The Mount Somers Branch, sometimes known as the Springburn Branch, was a branch line railway in the region of Canterbury, New Zealand. ...
The Waimate Branch was a railway line built in south Canterbury, New Zealand to the major rural town of Waimate. ...
Lower South Island Bluff - Catlins River - Dunback and Makareao - Fernhill - Hedgehope - Kingston - Kurow - Moeraki - Mossburn - Ngapara and Tokarahi - Outram - Port Chalmers - Roxburgh - Shag Point - Tapanui - Tokanui - Tuatapere - Waikaia - Waikaka - Wairio - Walton Park - Wyndham The Bluff Branch is a railway line in Southland, New Zealand that links Invercargill with the port of Bluff. ...
The Catlins River Branch was a branch line railway that formed part of New Zealands national rail network. ...
The Dunback and Makareao Branches were two connected branch line railways that formed part of New Zealands national rail network. ...
The Fernhill Branch is a railway line in Otago, New Zealand. ...
The Hedgehope Branch, also known as the Browns Branch, was a branch line railway in Southland, New Zealand that started life in the 1880s as a privately owned bush tramway. ...
The Kingston Branch was a major branch line railway in Southland, New Zealand. ...
The Moeraki Branch was one of the most short-lived railway lines in New Zealand. ...
The Mossburn Branch was a branch line railway in New Zealand from Lumsden on the Kingston Branch to the town of Mossburn in western Southland. ...
The Ngapara and Tokarahi Branches were two connected branch lines in northern Otago, New Zealand that formed part of the national railway system. ...
The Outram Branch was a branch line railway near Dunedin, Otago that operated from 1877 to 1953 as part of New Zealands national rail network. ...
The Port Chalmers Branch was the first railway line built in Otago, New Zealand, and linked the regions major city of Dunedin with the port in Port Chalmers. ...
The Shag Point Branch was a short branch off the Main South Line on the east coast of the South Island of New Zealand. ...
The Tapanui Branch was a railway line located near the border of the regions of Southland and Otago, New Zealand. ...
The Tokanui Branch, also known as the Seaward Bush Branch, was a railway line located in Southland, New Zealand. ...
The Tuatapere Branch, including the Orawia Branch, was a branch line railway in Southland, New Zealand. ...
The Waikaia Branch, also known as the Switzers Branch, was a branch line railway in Southland, New Zealand. ...
The Waikaka Branch was a railway line that ran through agricultural and gold-mining country in Southland, New Zealand. ...
The Wairio Branch is a branch line railway in Southland, New Zealand. ...
The Walton Park Branch was located in Otago, New Zealand and operated from 1874 until 1957, except for the first section, which survived until 1980. ...
The Wyndham Branch, also known as the Glenham Branch, was a railway line in Southland, New Zealand. ...
Private lines Glen Massey Branch - Dunedin Peninsula and Ocean Beach Railway - Dun Mountain Railway - Hutt Park Railway - Kaitangata Line - Sanson Tramway - Wellington and Manawatu Railway The Kaitangata Line was a branch line railway in Otago, New Zealand. ...
The Sanson Tramway was a tramway in the Manawatu region of New Zealand that operated from 1885 until 1945. ...
The Wellington and Manawatu Railway (WMR) was a railway between Thorndon in Wellington, the capital of New Zealand, and Longburn, near the town of Palmerston North, in the Manawatu. ...
| |