|
HMNZS Te Mana The Royal New Zealand Navy (RNZN) is the navy of New Zealand. ...
Image File history File links Naval_Ensign_of_New_Zealand. ...
HMNZS Te Mana The Royal New Zealand Navy (RNZN) is the navy of New Zealand. ...
A Seasprite of No. ...
// Origins Originally the British Royal Navy provided total security for the colony of New Zealand, but in 1846 the settlers bought a gunboat. ...
The military history of New Zealand spans several hundred years. ...
HMNZS Te Mana This is a list of current Royal New Zealand Navy ships as of 2005. ...
A HMNZS Achilles(i) World War II Cruiser HMNZS Arabis(i) Flower Class Corvette HMNZS Arbutus(i) Flower Class Corvette HMNZS Aroha HMNZS Awatere B HMNZS Blackpool (i) Whitby Class Frigate HMNZS Breeze(i) WW II Minesweeper C HMNZS Canterbury (F-421)- (i) Leander Class Frigate (ii) HMNZS Canterbury (L...
Devonport Naval Base is the home of the Royal New Zealand Navy, located at Devonport on Aucklands North Shore. ...
Current Planning Framework
The MoD Long-Term Development Plan (LTDP) is a planning tool to enable decisions on defence acquisitions to be taken in the context of the Government’s defence policy, the priority of projects and affordability. The LTDP links the Government’s defence policy objectives, which were set out in the Defence Policy Framework released in June 2000, with the capability requirements announced in the Defence Statement of 8 May 2001. This LTDP contains a comprehensive list of projects, with preliminary costing, timings, and priorities. The LTDP has a rolling forward focus of 10 years and was constructed as an active document and isupdated regularly. The LTDP: - Describes major acquisition projects required over the next 10 years to provide military capabilities that meet the Government’s defence policy objectives;
- Reflects relative priorities of the projects, measured against the Government’s defence policy and security needs and interests;
- Works within agreed financial limitations; and
- Sets out planning and decision-making processes incorporating management of both operational and financial risks to ensure that investment in defence provides best value for money.
The LTDP sets out several categories of projects. These are: - Projects Approved in Principle by Government
- Projects Necessary to Avoid the Failure of Policy
- Projects Necessary to Provide a Well-Equipped Land Force
- Projects Necessary to Avoid Significant Risks to Policy
- Projects that have Benefit but are Less Critical to Achieving Policy Objectives
Allocation of a project to a particular category does not necessarily reflect the order in which they will be started.
Shipbuilding Plans
HMNZS Canterbury under construction Image File history File linksMetadata NZ_MRV_(NZDF). ...
Image File history File linksMetadata NZ_MRV_(NZDF). ...
Project Protector Project Protector is the Ministry of Defense acquisition project to acquire one multi-role vessel, two offshore and four inshore patrol vessels, to be operated by the RNZN to conduct tasks for and with New Zealand Customs, the Department of Conservation, Ministry of Agriculture and Forestry, Ministry of Foreign Affairs and Trade, Ministry of Fisheries, Maritime Safety Authority of New Zealand & New Zealand Police. - The multi-role vessel (To be known as HMNZS Canterbury: L-421) is to replace HMNZS Canterbury. The Canterbury will have a 9000 tonne displacement, be 131 meters in length and be capable of 19 knots. Accommodation is for a total of 360 personnel; a crew of 53, 10 flight personnel, four government agency officers, a permanent team of 7 army personnel, plus provision for 35 trainees and 250 embarked troops. The vessel was built at the Merwede shipyard in Rotterdam in 2005-2006 and was launched on February 11, 2006 [1].
HMNZS Otago, launched in Williamstown, Melbourne on Saturday the 18th of November. - Four inshore patrol vessels (To be known as Lake Class Inshore Patrol Craft, using the previous names of Taupo, Pukaki, Hawea, Rotoiti) are to replace the MOA class patrol vessels. The proposed IPV would have a 340 tonne displacement, be 55 meters in length, capable of 25 knots with a range of up to 3000nm. Accommodation is for a crew of 20, 12 additional personnel, and four government agency officers. See RNZN IPV
- Two Medium Landing Craft (LCM): For use on HMNZS Canterbury the two LCM have a Length of 23mtrs and a displacement: Empty of 55 tonnes: Loaded with 2 NZLAV: 100 tonnes. Operated by a crew of 3, using two Azimuth thrusters generating 235kW. The MRV can be loaded from either of Canterbury's two 60 tonne cranes or via the stern ramp. To aid stern ramp loading the MRV is fitted with Flippers to ensure that the LCM are aligned with the MRV. A ballasting system is fitted to allow for safe operations during loading. Once loaded the LCM can conduct over the bench landings
HMNZS Canterbury under construction HMNZS Canterbury is a multi-role vessel of the Royal New Zealand Navy. ...
History HMNZS Canterbury was one of two broad beam Leander class frigates operated by the RNZN from 1971 to 2005. ...
The Merwede (etymology uncertain, possibly derived from the ancient Dutch word meaning wide water) is the name of several interconnected stretches of river in The Netherlands, all part of the Rhine-Meuse-Scheldt delta. ...
Rotterdam Location Coat of arms The coat of arms of Rotterdam. ...
February 11 is the 42nd day of the year in the Gregorian calendar. ...
For the Manfred Mann album, see 2006 (album). ...
Image File history File links Otago. ...
Image File history File links Otago. ...
Ships carrying the name HMNZS Otago are named after the Province of Otago in New Zealand, on the South Island and are normally associated with the City of Dunedin. ...
The Protector class is to be an off-shore patrol vessel of the Royal New Zealand Navy. ...
Please wikify (format) this article or section as suggested in the Guide to layout and the Manual of Style. ...
Units under Construction Project Protector Units are currently under construction. The Delivery Schedule 2006 - March Two LCMs for use with the Multi-Role Vessel
- December MRV
2007 - Jan/Feb Inshore Patrol Vessel 1
- April Offshore Patrol Vessel 1
- May/June IPV2
- September IPV3
- October OPV2
- December IPV4
System and Platform Upgrades Projects Necessary to Avoid the Failure of Policy ANZAC Self-Defence Upgrade This project proposes to upgrade the ANZAC frigates’ self-defence systems to protect the Naval Combat Force against increasingly sophisticated anti-ship systems and to address equipment obsolescence. Torpedo Replacement This project proposes to replace the torpedoes for the ANZAC frigates, P-3 Orions and SH-2G Seasprite helicopters to maintain the ANZAC’s basic self-defence capability against sub-surface threats and the P-3’s area anti-submarine capability.
Projects that have Benefit but are Less Critical to Achieving Policy Objectives Remote Mine Detection The Maritime Forces Review identified a requirement to protect New Zealand's major ports by developing a capacity to detect and dispose of mines and other explosives underwater. The Review concluded that the mine countermeasures role should be retained. The capability of the Navy to detect mine-like objects is becoming increasingly difficult as current equipment reaches the end of its economical life. Upgrading this capability would significantly improve the safety of personnel and ships over the current inadequate, emergency only, systems.
|