Mozambique - Time Needed to Deal with Construction Permits
Since 2015, Mozambique Time Needed to Deal with Construction Permits remained stable. With 950 Days in 2020, the country was number 25 comparing other countries in Time Needed to Deal with Construction Permits. Mozambique is overtaken by Swaziland, which was number 24 with 956 Days and is followed by Honduras with 920 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 950.00 |
2019 | 950.00 |
2018 | 950.00 |
2017 | 950.00 |
2016 | 950.00 |
Download all data from 2004 to 2020
How does Mozambique rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
24 |
#24
Swaziland
|
956.00 | 2020 | +0.0 % | +0.0 % | View data | |
25 |
#25
Mozambique
|
950.00 | 2020 | +0.0 % | +0.0 % | View data | |
26 |
#26
Honduras
|
920.00 | 2020 | +0.0 % | +0.0 % | View data |