Hong Kong - Time Needed to Deal with Construction Permits
Since 2014, Hong Kong Time Needed to Deal with Construction Permits was down by 1.3% year on year. With 72 Days in 2019, the country was ranked number 172 comparing other countries in Time Needed to Deal with Construction Permits. Cambodia ranked the highest with 652 Days in 2019, that is stable versus 2018. Cyprus, Barbados and Venezuela respectively ranked number 2, 3 and 4 in this ranking. El Salvador witnessed the best average annual growth at +21.2% per year, while Serbia was the worst growing country at -20% per year.
Loading...
Date | Days |
---|---|
2019 | 72.00 |
2018 | 72.00 |
2017 | 72.00 |
2016 | 72.00 |
2015 | 72.00 |
Download all data from 2006 to 2019
How does Hong Kong rank in Time Needed to Deal with Construction Permits?
# | 185 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Cambodia
|
652.00 | 2019 | +0.0 % | +0.0 % | View data | |
2 |
#2
Cyprus
|
507.00 | 2019 | +0.0 % | -5.6 % | View data | |
171 |
#171
Lithuania
|
74.00 | 2019 | -1.3 % | -9.8 % | View data | |
172 |
#172
Hong Kong
|
72.00 | 2019 | +0.0 % | -1.3 % | View data | |
172 |
#172
Palau
|
72.00 | 2019 | +0.0 % | +0.0 % | View data |