Hong Kong - Time Needed to Deal with Construction Permits

Since 2014, Hong Kong Time Needed to Deal with Construction Permits was down by 1.3% year on year. With 72 Days in 2019, the country was ranked number 172 comparing other countries in Time Needed to Deal with Construction Permits. Cambodia ranked the highest with 652 Days in 2019, that is stable versus 2018. Cyprus, Barbados and Venezuela respectively ranked number 2, 3 and 4 in this ranking. El Salvador witnessed the best average annual growth at +21.2% per year, while Serbia was the worst growing country at -20% per year.

Loading...

Date Days
2019 72.00
2018 72.00
2017 72.00
2016 72.00
2015 72.00
Download all data from 2006 to 2019

How does Hong Kong rank in Time Needed to Deal with Construction Permits?

# 185 Countries Days Last YoY 5‑years CAGR
1 #1
Cambodia
652.00 2019 +0.0 % +0.0 % View data
2 #2
Cyprus
507.00 2019 +0.0 % -5.6 % View data
171 #171
Lithuania
74.00 2019 -1.3 % -9.8 % View data
172 #172
Hong Kong
72.00 2019 +0.0 % -1.3 % View data
172 #172
Palau
72.00 2019 +0.0 % +0.0 % View data
Compare all 185 countries

Go Top