Azerbaijan - Time Needed to Deal with Construction Permits
Since 2015, Azerbaijan Time Needed to Deal with Construction Permits remained stable. At 277 Days in 2020, the country was number 180 among other countries in Time Needed to Deal with Construction Permits. Azerbaijan is overtaken by Georgia, which was ranked number 179 with 285 Days and is followed by Belarus with 275 Days. Guinea-Bissau lead the ranking with 1,785 Days in 2020, that is stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger recorded the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 277.00 |
2019 | 277.00 |
2018 | 277.00 |
2017 | 277.00 |
2016 | 277.00 |
Download all data from 2004 to 2020
How does Azerbaijan rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
179 |
#179
Georgia
|
285.00 | 2020 | +0.0 % | +0.0 % | View data | |
180 |
#180
Azerbaijan
|
277.00 | 2020 | +0.0 % | +0.0 % | View data | |
181 |
#181
Belarus
|
275.00 | 2020 | +0.0 % | +0.0 % | View data |