Belize - Time Needed to Deal with Construction Permits
Since 2015, Belize Time Needed to Deal with Construction Permits showed no change. At 892 Days in 2020, the country was number 31 comparing other countries in Time Needed to Deal with Construction Permits. Guinea-Bissau ranked the highest with 1,785 Days in 2020, that is stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 892.00 |
2019 | 892.00 |
2018 | 892.00 |
2017 | 892.00 |
2016 | 892.00 |
Download all data from 2006 to 2020
How does Belize rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
29 |
#29
Nepal
|
910.00 | 2020 | +0.0 % | +0.0 % | View data | |
31 |
#31
Belize
|
892.00 | 2020 | +0.0 % | +0.0 % | View data | |
32 |
#32
Federated States of Micronesia
|
885.00 | 2020 | +0.0 % | +0.0 % | View data |