Federated States of Micronesia - Time Needed to Deal with Construction Permits
Since 2015, Federated States of Micronesia Time Needed to Deal with Construction Permits showed no change. In 2020, the country was ranked number 32 comparing other countries in Time Needed to Deal with Construction Permits at 885 Days. Federated States of Micronesia is overtaken by Belize, which was ranked number 31 at 892 Days and is followed by Syria at 872 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger was the worst growing country at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 885.00 |
2019 | 885.00 |
2018 | 885.00 |
2017 | 885.00 |
2016 | 885.00 |
Download all data from 2004 to 2020
How does Federated States of Micronesia rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
31 |
#31
Belize
|
892.00 | 2020 | +0.0 % | +0.0 % | View data | |
32 |
#32
Federated States of Micronesia
|
885.00 | 2020 | +0.0 % | +0.0 % | View data | |
33 |
#33
Syria
|
872.00 | 2020 | +0.0 % | +0.0 % | View data |