Angola - Time Needed to Deal with Construction Permits

Since 2015, Angola Time Needed to Deal with Construction Permits showed no change. In 2020, the country was ranked number 11 comparing other countries in Time Needed to Deal with Construction Permits at 1,296 Days. Angola is overtaken by Liberia, which was ranked number 10 with 1,300 Days and is followed by Colombia with 1,288 Days. Guinea-Bissau lead the ranking with 1,785 Days in 2020, that is stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger was the worst growing country at -7% per year.

Loading...

Date Days
2020 1,296.00
2019 1,296.00
2018 1,296.00
2017 1,296.00
2016 1,296.00
Download all data from 2004 to 2020

How does Angola rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
10 #10
Liberia
1,300.00 2020 +0.0 % +0.0 % View data
11 #11
Angola
1,296.00 2020 +0.0 % +0.0 % View data
12 #12
Colombia
1,288.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries

Go Top