Antigua and Barbuda - Time Needed to Deal with Construction Permits
Since 2015, Antigua and Barbuda Time Needed to Deal with Construction Permits remained stable. In 2020, the country was number 140 comparing other countries in Time Needed to Deal with Construction Permits at 476 Days. Antigua and Barbuda is overtaken by Peru, which was number 139 at 478 Days and is followed by Equatorial Guinea at 475 Days. Guinea-Bissau lead the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 476.00 |
2019 | 476.00 |
2018 | 476.00 |
2017 | 476.00 |
2016 | 476.00 |
Download all data from 2006 to 2020
How does Antigua and Barbuda rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
139 |
#139
Peru
|
478.00 | 2020 | +0.0 % | +0.0 % | View data | |
140 |
#140
Antigua and Barbuda
|
476.00 | 2020 | +0.0 % | +0.0 % | View data | |
141 |
#141
Equatorial Guinea
|
475.00 | 2020 | +0.0 % | +0.0 % | View data |