Belarus - Time Needed to Deal with Construction Permits

Since 2015, Belarus Time Needed to Deal with Construction Permits remained stable. In 2020, the country was number 181 among other countries in Time Needed to Deal with Construction Permits at 275 Days. Belarus is overtaken by Azerbaijan, which was number 180 with 277 Days and is followed by Rwanda with 230 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, that is stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger was the worst growing country at -7% per year.

Loading...

Date Days
2020 275.00
2019 275.00
2018 275.00
2017 275.00
2016 275.00
Download all data from 2004 to 2020

How does Belarus rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
180 #180
Azerbaijan
277.00 2020 +0.0 % +0.0 % View data
181 #181
Belarus
275.00 2020 +0.0 % +0.0 % View data
182 #182
Rwanda
230.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries