Belarus - Time Needed to Deal with Construction Permits
Since 2015, Belarus Time Needed to Deal with Construction Permits remained stable. In 2020, the country was number 181 among other countries in Time Needed to Deal with Construction Permits at 275 Days. Belarus is overtaken by Azerbaijan, which was number 180 with 277 Days and is followed by Rwanda with 230 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, that is stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger was the worst growing country at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 275.00 |
2019 | 275.00 |
2018 | 275.00 |
2017 | 275.00 |
2016 | 275.00 |
Download all data from 2004 to 2020
How does Belarus rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
180 |
#180
Azerbaijan
|
277.00 | 2020 | +0.0 % | +0.0 % | View data | |
181 |
#181
Belarus
|
275.00 | 2020 | +0.0 % | +0.0 % | View data | |
182 |
#182
Rwanda
|
230.00 | 2020 | +0.0 % | +0.0 % | View data |