Gambia - Time Needed to Deal with Construction Permits

Since 2015, Gambia Time Needed to Deal with Construction Permits remained stable. In 2020, the country was ranked number 45 comparing other countries in Time Needed to Deal with Construction Permits with 758 Days. Gambia is overtaken by Maldives, which was number 44 with 760 Days and is followed by Portugal at 755 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger was the worst growing country at -7% per year.

Loading...

Date Days
2020 758.00
2019 758.00
2018 758.00
2017 758.00
2016 758.00
Download all data from 2006 to 2020

How does Gambia rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
44 #44
Maldives
760.00 2020 +0.0 % +0.0 % View data
45 #45
Gambia
758.00 2020 +0.0 % +0.0 % View data
46 #46
Portugal
755.00 2020 +0.0 % -2.8 % View data
Compare all 187 countries