Kosovo - Time Needed to Deal with Construction Permits
Since 2015, Kosovo Time Needed to Deal with Construction Permits remained stable. At 330 Days in 2020, the country was number 175 comparing other countries in Time Needed to Deal with Construction Permits. Kosovo is overtaken by Russia, which was ranked number 174 at 340 Days and is followed by Luxembourg with 321 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger was the worst growing country at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 330.00 |
2019 | 330.00 |
2018 | 330.00 |
2017 | 330.00 |
2016 | 330.00 |
Download all data from 2010 to 2020
How does Kosovo rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
174 |
#174
Russia
|
340.00 | 2020 | +0.0 % | +1.9 % | View data | |
175 |
#175
Kosovo
|
330.00 | 2020 | +0.0 % | +0.0 % | View data | |
176 |
#176
Luxembourg
|
321.00 | 2020 | +0.0 % | +0.0 % | View data |