Latvia - Time Needed to Deal with Construction Permits
Since 2015, Latvia Time Needed to Deal with Construction Permits remained stable. In 2020, the country was number 142 comparing other countries in Time Needed to Deal with Construction Permits with 469 Days. Latvia is overtaken by Equatorial Guinea, which was number 141 with 475 Days and is followed by Kenya with 465 Days. Guinea-Bissau lead the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 469.00 |
2019 | 469.00 |
2018 | 469.00 |
2017 | 469.00 |
2016 | 469.00 |
Download all data from 2004 to 2020
How does Latvia rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
141 |
#141
Equatorial Guinea
|
475.00 | 2020 | +0.0 % | +0.0 % | View data | |
142 |
#142
Latvia
|
469.00 | 2020 | +0.0 % | +0.0 % | View data | |
143 |
#143
Kenya
|
465.00 | 2020 | +0.0 % | +0.0 % | View data |