Macedonia - Time Needed to Deal with Construction Permits

Since 2015, Macedonia Time Needed to Deal with Construction Permits grew 1% year on year. In 2020, the country was number 69 comparing other countries in Time Needed to Deal with Construction Permits at 634 Days. Macedonia is overtaken by Bahrain, which was number 68 with 635 Days and is followed by Algeria with 630 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger recorded the worst performance at -7% per year.

Loading...

Date Days
2020 634.00
2019 634.00
2018 634.00
2017 634.00
2016 604.00
Download all data from 2004 to 2020

How does Macedonia rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
68 #68
Bahrain
635.00 2020 +0.0 % +0.0 % View data
69 #69
Macedonia
634.00 2020 +0.0 % +1.0 % View data
70 #70
Algeria
630.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries

Go Top