Macedonia - Time Needed to Deal with Construction Permits
Since 2015, Macedonia Time Needed to Deal with Construction Permits grew 1% year on year. In 2020, the country was number 69 comparing other countries in Time Needed to Deal with Construction Permits at 634 Days. Macedonia is overtaken by Bahrain, which was number 68 with 635 Days and is followed by Algeria with 630 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger recorded the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 634.00 |
2019 | 634.00 |
2018 | 634.00 |
2017 | 634.00 |
2016 | 604.00 |
Download all data from 2004 to 2020
How does Macedonia rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
68 |
#68
Bahrain
|
635.00 | 2020 | +0.0 % | +0.0 % | View data | |
69 |
#69
Macedonia
|
634.00 | 2020 | +0.0 % | +1.0 % | View data | |
70 |
#70
Algeria
|
630.00 | 2020 | +0.0 % | +0.0 % | View data |