Panama - Time Needed to Deal with Construction Permits

Since 2015, Panama Time Needed to Deal with Construction Permits remained stable. In 2020, the country was ranked number 42 comparing other countries in Time Needed to Deal with Construction Permits with 790 Days. Panama is overtaken by Cameroon, which was ranked number 41 at 800 Days and is followed by Slovakia at 775 Days. Guinea-Bissau lead the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger was the worst growing country at -7% per year.

Loading...

Date Days
2020 790.00
2019 790.00
2018 790.00
2017 790.00
2016 790.00
Download all data from 2004 to 2020

How does Panama rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
41 #41
Cameroon
800.00 2020 +0.0 % +0.0 % View data
42 #42
Panama
790.00 2020 +0.0 % +0.0 % View data
43 #43
Slovakia
775.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries

Go Top