Swaziland - Time Needed to Deal with Construction Permits
Since 2015, Swaziland Time Needed to Deal with Construction Permits showed no change. With 956 Days in 2020, the country was ranked number 24 comparing other countries in Time Needed to Deal with Construction Permits. Swaziland is overtaken by Philippines, which was ranked number 23 with 962 Days and is followed by Mozambique with 950 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger was the worst growing country at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 956.00 |
2019 | 956.00 |
2018 | 956.00 |
2017 | 956.00 |
2016 | 956.00 |
Download all data from 2006 to 2020
How does Swaziland rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
23 |
#23
Philippines
|
962.00 | 2020 | +0.0 % | +0.0 % | View data | |
24 |
#24
Swaziland
|
956.00 | 2020 | +0.0 % | +0.0 % | View data | |
25 |
#25
Mozambique
|
950.00 | 2020 | +0.0 % | +0.0 % | View data |