Syria - Time Needed to Deal with Construction Permits

Since 2015, Syria Time Needed to Deal with Construction Permits showed no change. With 872 Days in 2020, the country was number 33 comparing other countries in Time Needed to Deal with Construction Permits. Syria is overtaken by Federated States of Micronesia, which was ranked number 32 with 885 Days and is followed by Costa Rica at 852 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.

Loading...

Date Days
2020 872.00
2019 872.00
2018 872.00
2017 872.00
2016 872.00
Download all data from 2004 to 2020

How does Syria rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
32 #32
Federated States of Micronesia
885.00 2020 +0.0 % +0.0 % View data
33 #33
Syria
872.00 2020 +0.0 % +0.0 % View data
34 #34
Costa Rica
852.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries

Go Top