Libya - Time Needed to Deal with Construction Permits

Since 2015, Libya Time Needed to Deal with Construction Permits remained stable. At 690 Days in 2020, the country was ranked number 54 comparing other countries in Time Needed to Deal with Construction Permits. Libya is overtaken by Djibouti, which was number 53 with 695 Days and is followed by Grenada at 688 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, that is stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.

Loading...

Date Days
2020 690.00
2019 690.00
2018 690.00
2017 690.00
2016 690.00
Download all data from 2013 to 2020

How does Libya rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
53 #53
Djibouti
695.00 2020 +0.0 % +0.0 % View data
54 #54
Libya
690.00 2020 +0.0 % +0.0 % View data
55 #55
Grenada
688.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries