Grenada - Time Needed to Deal with Construction Permits

Since 2015, Grenada Time Needed to Deal with Construction Permits remained stable. At 688 Days in 2020, the country was ranked number 55 among other countries in Time Needed to Deal with Construction Permits. Grenada is overtaken by Libya, which was ranked number 54 with 690 Days and is followed by Poland with 685 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger was the worst growing country at -7% per year.

Loading...

Date Days
2020 688.00
2019 688.00
2018 688.00
2017 688.00
2016 688.00
Download all data from 2006 to 2020

How does Grenada rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
54 #54
Libya
690.00 2020 +0.0 % +0.0 % View data
55 #55
Grenada
688.00 2020 +0.0 % +0.0 % View data
56 #56
Poland
685.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries