Poland - Time Needed to Deal with Construction Permits
Since 2015, Poland Time Needed to Deal with Construction Permits remained stable. With 685 Days in 2020, the country was ranked number 56 comparing other countries in Time Needed to Deal with Construction Permits. Poland is overtaken by Grenada, which was number 55 with 688 Days and is followed by Czech Republic with 678 Days. Guinea-Bissau ranked the highest with 1,785 Days in 2020, that is stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger was the worst growing country at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 685.00 |
2019 | 685.00 |
2018 | 685.00 |
2017 | 685.00 |
2016 | 685.00 |
Download all data from 2004 to 2020
How does Poland rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
55 |
#55
Grenada
|
688.00 | 2020 | +0.0 % | +0.0 % | View data | |
56 |
#56
Poland
|
685.00 | 2020 | +0.0 % | +0.0 % | View data | |
57 |
#57
Czech Republic
|
678.00 | 2020 | +0.0 % | +0.0 % | View data |