Poland - Time Needed to Deal with Construction Permits

Since 2015, Poland Time Needed to Deal with Construction Permits remained stable. With 685 Days in 2020, the country was ranked number 56 comparing other countries in Time Needed to Deal with Construction Permits. Poland is overtaken by Grenada, which was number 55 with 688 Days and is followed by Czech Republic with 678 Days. Guinea-Bissau ranked the highest with 1,785 Days in 2020, that is stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger was the worst growing country at -7% per year.

Loading...

Date Days
2020 685.00
2019 685.00
2018 685.00
2017 685.00
2016 685.00
Download all data from 2004 to 2020

How does Poland rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
55 #55
Grenada
688.00 2020 +0.0 % +0.0 % View data
56 #56
Poland
685.00 2020 +0.0 % +0.0 % View data
57 #57
Czech Republic
678.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries