Former Soviet republics Compared by Energy > Delay in obtaining an electrical connection > Days

DEFINITION: Delay in obtaining an electrical connection (days). Delay in obtaining an electrical connection is the average wait, in days, experienced to obtain an electrical connection from the day an establishment applies for it to the day it receives the service.

CONTENTS

# COUNTRY AMOUNT DATE GRAPH HISTORY
1 Estonia 207.2 2009
2 Russia 120.4 2012
3 Latvia 93.2 2009
4 Lithuania 63 2009
5 Ukraine 47.9 2008
6 Kazakhstan 47.8 2009
7 Tajikistan 28.3 2008
8 Uzbekistan 28 2008
9 Kyrgyzstan 25.2 2009
10 Moldova 24.3 2009
11 Belarus 23.8 2013
12 Armenia 16.3 2009
13 Georgia 11.4 2008
14 Azerbaijan 9.7 2009

Citation

Former Soviet republics Compared by Energy > Delay in obtaining an electrical connection > Days

NationMaster

Interesting observations about Energy > Delay in obtaining an electrical connection > Days

Follow us on Facebook to get interesting stats:

Adblocker detected! Please consider reading this notice.

We've detected that you are using AdBlock Plus or some other adblocking software which is preventing the page from fully loading.

We don't have any banner, Flash, animation, obnoxious sound, or popup ad. We do not implement these annoying types of ads!

We need money to operate the site, and almost all of it comes from our online advertising.

Please add www.nationmaster.com to your ad blocking whitelist or disable your adblocking software.

×